Share

Author: admin

Parking Survey Completed in Bromley Using Lambeth Methodology

  • July 13, 2025
  • News
  • Comments Off on Parking Survey Completed in Bromley Using Lambeth Methodology

A parking stress survey has been successfully completed at Dunkery Road, Bromley, SE9 4LP, in support of a proposed residential development. The survey was delivered on time and conducted in line with the Lambeth parking survey methodology, which is used by Bromley Council for assessing the impact of new developments on on-street parking. Covering a […]

read more

From Stone to Street: Alpendurada Granite Shaping the UK Public Realm

Nestled in the rolling hills of Alpendurada, just a stone’s throw (pun fully intended) from the banks of the Douro River, lies a powerhouse of Portuguese granite production. This isn’t just any stone – this is precision-cut, architecturally refined granite that finds its way into paving slabs, kerbs, benches, and bespoke natural stone solutions across […]

read more

Richmond Methodology Parking Stress Surveys for Croydon Council

  • April 20, 2025
  • News
  • Comments Off on Richmond Methodology Parking Stress Surveys for Croydon Council

We’re pleased to announce the successful completion of a parking stress survey for a residential development at Birchanger Road, SE25 5BE. The survey was delivered on time and in full accordance with the Richmond Methodology, which is accepted by several London boroughs, including Croydon London Borough Council, for assessing residential parking capacity and stress. Prior […]

read more

Parking Stress Surveys in Croydon Using Richmond Methodology

  • April 4, 2025
  • News
  • Comments Off on Parking Stress Surveys in Croydon Using Richmond Methodology

We’re pleased to announce the successful completion of several parking stress surveys for residential development projects in Croydon, all carried out in accordance with the Richmond Methodology. This approach is widely accepted by local councils, including Croydon, and ensures accurate, policy-compliant assessments of on-street parking capacity and stress levels. Each survey was carefully scoped with […]

read more

Surface Water Drainage Basics For New Developments

Understanding Surface Water Drainage Surface water drainage is the process of managing rainwater and runoff from roads, roofs, and other impervious surfaces. Effective surface water drainage design is critical for residential developments, ensuring that water is managed efficiently to prevent flooding, protect property, and promote environmental sustainability. Effective surface water drainage design is crucial for […]

read more

A Simple Guide to Transport Assessment and Transport Statement Reports for Developers

What are Transport Assessments? Transport Assessments are critical documents produced and submitted as part of major developments where the proposed project has a significant transport impact. These assessments provide a detailed analysis of any transport-related issues associated with the proposed development. What are Transport Statements? For schemes not large enough to require a full Transport […]

read more

SEO basics for Small Businesses in the Construction Industry 

Unlikely Conversations: SEO Basics for Small Businesses Last week, a persistent pain in my left elbow led me to seek help from a physiotherapist. An injury I found to be strange unlike having a dodgy shoulder and other football related injuries. Little did I know that this visit would offer more than just relief for […]

read more

Section 50 Agreements – Placing Apparatus in the Highway

A Section 50 Agreement is an Agreement between a developer or contractor and a Local Highway Authority for a licence to work or place apparatus within the highway. The legislation is covered by the New Roads and Street Works Act 1991, with the pertinent licence information outlined within Section 50.  The Section 50 licence covers […]

read more

Section 247/248 Agreements – Stopping up of the Highway

Stopping up is a process which allows for the permanent closure or diversion of the adopted highway. Part of the Town and Country Planning Act 1990, the process is facilitated by the Department for Transport (DfT) with the stopping up Order being authorised by the Secretary of State. The process of stopping up or diverting the highway […]

read more

Section 278 Agreements – Permanent Alterations to the Highway

Section 278 Agreements are a legal agreement between a developer and the Local Highway Authority (LHA) which allows the developer to make permanent alterations to the adopted highway as part of a valid planning permission. The Section 278 Agreements are outlined within the Highways Act 1980. The Section 278 Agreement process ensures that all works […]

read more
1 2 3